After years on hold, one of east London's biggest waterfront regeneration sites is finally on the move. Silvertown Homes has secured a £2.7bn development deal with the Greater London Authority (GLA) to bring forward Thameside West, a 47-acre site in the Royal Docks earmarked for at least 5,000 homes. The GLA made a direct award to the Arada-backed developer, pointing to its existing land ownership and development rights across the site. The £2.705bn figure, published in a GLA contract award notice on 16 November, covers a 30-year development agreement running to 2056.
The scheme had stalled for years, partly because of the Silvertown Tunnel works and tough market conditions. UAE developer Arada took a minority stake in Silvertown Homes' parent company, Keystone Silvertown, last year and is expected to take majority control in 2027. Under the deal, the GLA will release public land in stages as building progresses, collecting land payments plus further returns linked to development values. As the award notice puts it, "Arada's involvement therefore unlocks the scheme for the Site and avoids further prolonged inactivity." Formal signing is expected on 17 December.
As for what's actually going up, Arada has already lodged plans with Newham Council for the first 1,500 homes across six buildings, including two blocks entirely for social rent. The wider masterplan adds a seven-acre park, commercial space and a kilometre of new Thames waterfront, plus a proposed Thames Wharf DLR station that Arada is working on with Transport for London. Gensler leads the design team alongside Arup and landscape architect Planit, with Arada London lined up for the first phase. Construction is targeted for 2028, subject to planning, with the full programme running into the 2040s.